+90 539 356 44 17 444 5 194
Login Sign Up

🏗️ Bahrain EWA – Renovation of ABB MicroSCADA SYS600C ICS Gateways at Diyar Al Muharraq 220kV Substation (Version 5.10)

The Bahrain Electricity and Water Authority (EWA) is tendering the replacement of existing ABB MicroSCADA ICS gateways at the Diyar Al Muharraq 220kV substation with MicroSCADA SYS600C Version 5.10 (or equivalent) industrial gateways fully compatible with the existing system. The scope of work includes testing and commissioning activities, along wi...

Bahrain
tender
5 credits
31 views

join us

Here is the information of this company..

Please login to view the post details and attachments .